    Hi Everyone

     

     

    Please let me know if there is possibility to configure backup system process such as ewsd , chassisd , rpd etc so that in case of primary process failure the backup will continue in operation.

     

     

    Thanks

     

    Amit



  • 2.  RE: Backup System process in EX series Switches

    Posted 09-23-2014 10:44

    Hi,

     

    It depends what you want to do.

     

    You can provide redundancy running two (or more) EX switches in a virtual-chassis

    http://www.juniper.net/techpubs/en_US/junos13.2/topics/concept/virtual-chassis-ex4200-components.html

     

    Some EX switches (EX6200, EX8200, EX9200) have redundant routing-engines.

     

     

    --
    Click the star for kudos if you think I earned it.
    If this post solves your problem, please mark this post as "Accepted Solution".



  • 3.  RE: Backup System process in EX series Switches
    Best Answer

     
    Posted 09-24-2014 00:55

    You are looking for gres, non-stop routing and non-stop bridging:

     

    http://www.juniper.net/techpubs/en_US/junos12.1/topics/concept/nonstop-bridging-ex-series.html

     

    http://www.juniper.net/techpubs/en_US/junos14.1/topics/concept/gres-overview.html

     

    http://www.juniper.net/techpubs/en_US/junos13.3/topics/concept/nsr-overview.html

     

     

     

    =====